Nov, 29, 2014

0

CHOOSING DECORATIVE KNOBS AND PULLS FOR YOUR KITCHEN CABINETRY

Adding decorative hardware to kitchen cabinetry is often likened to adding a piece of jewelry to that little black dress. A knob or a pull is the finishing touch that can add flair, personality, and individuality to your kitchen. When planning your new space, you should give plenty of thought to the decorative hardware that […] Read more

Nov, 23, 2014

0

SELECTING COUNTERTOP MATERIALS

When selecting your countertop materials, there are several things you should consider: your lifestyle, budget restraints, and the overall look and durability of the material. It is important that the material is not only comfortable to work on, but since it is the hardest working surface in the kitchen, it also needs to perform at […] Read more

Nov, 23, 2014

0

FINISHING — ESTIMATED TIME: 2-3 WEEKS

After all the intricate, behind-the-scenes work is completed, the finishes can be installed. In this stage, cabinets, countertops, flooring, appliances, and fixtures are put into place. Installation looks easier than it actually is. For example, countertops need to be made level so nothing will roll off and this isn’t possible if the base cabinets are […] Read more

Nov, 23, 2014

0

ROUGH CONSTRUCTION — ESTIMATED TIME: 2-4 WEEKS

The fifth stage is for new construction. This is an exciting part of a renovation because the homeowner can watch each day’s progress firsthand. The timeline of this stage really depends on the scheduling and availability of contractors, plumbers, electricians, and other professionals needed for the project. Below we’ve listed the different parts of construction […] Read more

Nov, 23, 2014

0

DEMOLITION, DISASSEMBLY, AND DISPOSAL

Demolition, disassembly, and disposal — Estimated time: 2-3 days Demolition, or tear-out, is a vital part of any home renovation. In this stage, the old elements are broken down and removed to make room for the newer, better materials and appliances. Compared to the effort that goes into installing a kitchen, demolition is a much […] Read more

Nov, 23, 2014

0

CREATE A TEMPORARY KITCHEN

Packing up your kitchen Estimated time: 1-2 days In order to renovate your kitchen, you’re going to need to clean it and clear it out. Pack items into boxes by similarity. For example, put dishes in one box and pots and pans in another. Also, labeling the boxes will help you find items later when […] Read more

Nov, 23, 2014

0

PREPARING AND BUILDING PERMITS — ESTIMATED TIME: 1 DAY

Depending on your location, different regulations and codes will apply. Your contractor will help you with the paperwork and filing for building permits. Kitchen remodels that include modifying an exterior wall, altering the electrical system, removing the sub-flooring, or altering the plumbing to move your sink or dishwasher are all likely to require separate permits.

Nov, 23, 2014

0

KITCHEN PLANNING — ESTIMATED TIME: 3-4 WEEKS

Design and layout It is important to have a vision of what you want your final kitchen remodel to look like. Creating an idea file with pictures, patterns, brochures, and other inspiration will help you discover your style and needs. It is also wise to hire a professional kitchen designer to help transform your ideas into a […] Read more

Nov, 23, 2014

0

HOW LONG WILL MY KITCHEN REMODEL REALLY TAKE?

Remodeling a kitchen is not a weekend, or even a week-long project. No matter how quickly Extreme Makeover: Home Edition or HGTV make it seem, the average remodel is a process that will often take a few months. The future remodeler should understand that splitting up the remodel into separate phases will help make the project more […] Read more

Nov, 23, 2014